Description
Our office was involved from the project design stage through to the supervision of work on the heating, ventilation, air-conditioning, refrigeration and control installations for the purpose of obtaining the Minergie label.
Services
- The following technologies were analysed, designed and subsequently implemented to achieve the energy objectives of this project:
- A groundwater heat pump to meet all heating and domestic hot water (DHW) requirements.
- Thermal solar panels to meet the basic DHW requirements (40%).
- Double-flow ventilation.
- A digital regulation system with a control centre.