Description
Our office was involved from the project design stage through to the supervision of work on the heating, ventilation, air-conditioning, refrigeration and control installations.
Services
The site required particular attention:
- Regarding the air-conditioning, as it hosts rooms with different uses: laboratories (class P1 to P3), offices, auditorium...
- Refrigeration: The new buildings were connected to the CMU's iced-water circuit and new systems were installed to meet the technical refrigeration requirements.